Checklist binnenafwerking zolder

During the interior finishing of a loft or dormer, the walls, ceiling, floor, and installations come together. This checklist outlines the points of attention.

Hoofdgids · 11 min lezenChecklist voor dakkapel en zolderverbouwing
E-mail

Work sequence

  1. Battening and finishing trim, with correct vapour barrier.
  2. Installing electricity, data, and optionally water.
  3. Attaching plasterboard or sheet materials.
  4. Taping, filling, and sanding seams.
  5. Painting, wallpapering, or applying plaster finishes.
  6. Laying the floor finish last.